Saipem wins $1.5b contract for third phase of Turkey's largest gas field
Saipem’s scope of work encompasses the engineering, procurement, construction, and installation (EPCI) of eight rigid flowlines and a 24-inch diameter gas export pipeline that will be approximately 183 kilometres long.
The pipeline will connect the offshore field, at a maximum water depth of 2,200 metres, to an onshore facility in Filyos.
Content Original Link:
" target="_blank">