24
Sat, May

First Fleet of 3000 DWT Hopper Barges Launches at Brazil Shipyard

First Fleet of 3000 DWT Hopper Barges Launches at Brazil Shipyard

MARINELOG

On May 7, 2025, the first in a groundbreaking fleet of 3,000-ton deadweight hopper barges, designed by Robert Allan Ltd., was officially launched at Juruá Shipyard in Manaus, Brazil. The event marked

On May 7, 2025, the first in a groundbreaking fleet of 3,000-ton deadweight hopper barges, designed by Robert Allan Ltd., was officially launched at Juruá Shipyard in Manaus, Brazil. The event marked a milestone in LHG Mining’s river transportation initiative in South America.

This inaugural barge is part of a 400-unit fleet commissioned by LHG Mining to enable the efficient, sustainable transport of high-grade iron ore from Corumbá, Brazil, to export terminals in Uruguay. The cargo will travel over 2,500 kilometers along the Paraná–Paraguay Waterway, a vital inland corridor connecting Brazil, Bolivia, Paraguay, Argentina, and Uruguay to the Atlantic Ocean.

A total of four shipyards across Brazil have been contracted to construct the fleet. The successful launch at Juruá Shipyard represents a significant first step.

Each convoy is comprised of 16 barges (8 rake and 8 box barges) pushed by a high-powered inland RApide pushboat, also designed by Robert Allan Ltd. Each convoy will transport over 50,000 deadweight tonnes of iron ore, matching the capacity of a typical Supramax ore carrier.

The launch event brought together representatives from LHG Mining, Robert Allan Ltd., equipment suppliers, and local authorities, celebrating the start of a bold new chapter in regional logistics.

Principal

Content Original Link:

Read Full article form Original Source MARINELINK

" target="_blank">

Read Full article form Original Source MARINELINK

SILVER ADVERTISERS

BRONZE ADVERTISERS

Infomarine banners

Advertise in Maritime Directory

Publishers

Publishers