16
Thu, Oct

Coast Guard Orders Additional Waterways Commerce Cutters

Coast Guard Orders Additional Waterways Commerce Cutters

MARINELOG

The US Coast Guard is moving forward with the acquisition of the new Waterways Commerce Cutter (WCC) class, designed to replace the legacy fleet of inland tenders and facilitate commerce vital to

The US Coast Guard is moving forward with the acquisition of the new Waterways Commerce Cutter (WCC) class, designed to replace the legacy fleet of inland tenders and facilitate commerce vital to the nation’s economic security and strategic mobility.

The service has ordered production of the first river buoy tender (WLR) and long lead time material (LLTM) for the second inland construction tender (WLIC), with construction to take place at Birdon America, Inc.’s shipyard in Bayou La Batre, Alabama.

In addition, the Coast Guard has placed an order for three sets of LLTM to support future production.

The total value of the production and LLTM orders is approximately $110 million.

Inland construction tenders play a critical role in constructing, repairing, and maintaining fixed aids to navigation (ATON) along the Eastern Seaboard and Gulf Coast. These cutters are uniquely equipped to drive and remove piles, erect towers, and perform major structural modifications.

Construction of the first WLIC, ordered in June 2025, is expected to be completed in 2027.

River buoy tenders service short-range ATON on the Western Rivers, setting, relocating, and recovering buoys to mark navigable channels as water levels fluctuate. They also establish and maintain fixed aids, lights, and daybeacons.

Content Original Link:

Read Full article form Original Source MARINELINK

" target="_blank">

Read Full article form Original Source MARINELINK

SILVER ADVERTISERS

BRONZE ADVERTISERS

Infomarine banners

Advertise in Maritime Directory

Publishers

Publishers