GTT has received an order from its partner the shipyard Hanwha Ocean for the tank design of a new LNG1 Carrier, on behalf of a North America-based ship-owner.The vessel will be equipped
GTT has received an order from its partner the shipyard Hanwha Ocean for the tank design of a new LNG1 Carrier, on behalf of a North America-based ship-owner.
The vessel will be equipped with cryogenic tanks designed by GTT for the transport of LNG, offering a total capacity of 174,000 m³. These tanks will incorporate the NO96 L03+ membrane containment system, a technology developed by GTT.
Delivery of the vessel is scheduled for the second quarter of 2028.
Content Original Link:
" target="_blank">