GTT announced that it has received, in early 2026, an order from HD Korea Shipbuilding & Offshore Engineering (HD KSOE) for the tank design of four new Liquefied Natural Gas Carriers (LNGCs).The
GTT announced that it has received, in early 2026, an order from HD Korea Shipbuilding & Offshore Engineering (HD KSOE) for the tank design of four new Liquefied Natural Gas Carriers (LNGCs).
The LNGCs will be built by the shipyard HD Hyundai Heavy Industries, each with a capacity of 200,000 m³. The cryogenic tanks of the vessels will be equipped with the Mark III Flex+ membrane containment system, developed by GTT.
Delivery of the vessels is scheduled between the third quarter of 2028 and the first quarter of 2029.
Content Original Link:
" target="_blank">

