28
Fri, Feb

Heerema’s vessel done with Australian installation job to expand gas project’s production lifespan (Gallery)

Heerema’s vessel done with Australian installation job to expand gas project’s production lifespan (Gallery)

Green Energy
Heerema’s vessel done with Australian installation job to expand gas project’s production lifespan (Gallery)

Inpex has disclosed the end of a miles-long journey, which Heerema Marine Contractors and its heavy lift vessel embarked on to transport a liquefied natural gas (LNG) booster compression module (BCM) from Indonesia to Australia, where it was put in place to up the production ante from a subsea reservoir at Inpex’s offshore energy project.

The post Heerema’s vessel done with Australian installation job to expand gas project’s production lifespan (Gallery) appeared first on Offshore Energy.

Content Original Link:

Original Source OFSHORE ENERGY

" target="_blank">

Original Source OFSHORE ENERGY

SILVER ADVERTISERS

BRONZE ADVERTISERS

Infomarine banners

Advertise in Maritime Directory

Publishers