07
Fri, Feb

Lithuanian Port Goes Forward with Quay Reconstruction for Offshore Wind

Offshore Engineer

Klaipėda Port Authority in Lithuania has signed an agreement for the infrastructure buildout for the offshore wind energy projects, starting with the reconstruction of quays on Smeltė peninsula…

(Credit: Klaipėda Port Authority)
(Credit: Klaipėda Port Authority)

Klaipėda Port Authority in Lithuania has signed an agreement for the infrastructure buildout for the offshore wind energy projects, starting with the reconstruction of quays on Smeltė peninsula, which will ensure assembly, handling and transportation of offshore wind turbines.

The successful tenderer UAB Tilsta has been tasked with reconstructing the quays at the former International Ferry Port under the $37.9 million contract.

As the reconstructed quays will be used for assembly, handling, storage and transportation of wind turbines, the work site will be designed for high loads (40 t/m2).

In total, around 453 m of quays will be reconstructed on Smeltė peninsula. The contractor has also been tasked with carrying out dredging works in the quays to a depth of 12 metres. The current depth is 10 metres.

The reconstruction of quays is expected to be completed by the end of 2026.

Further away from the quays, the depth of 12 meters has already been reached.

To support the offshore wind infrastructure development in the country, Klaipėda State Seaport Authority and Klaipėda Stevedoring Company KLASCO signed the investment agreement in May 2022.

The

Content Original Link:

Read full article from Original Source OFFSHORE ENGINEER

" target="_blank">

Read full article from Original Source OFFSHORE ENGINEER

SILVER ADVERTISERS

BRONZE ADVERTISERS

Infomarine banners

Advertise in Maritime Directory

Publishers