20
Sun, Apr

TDI-Brooks Completes Trinidad Geotechnical Project

Offshore Engineer

TDI-Brooks reportst that it 'effectively and safely' carried out a third-party geotechnical coring project for Geohidra. This operation was conducted from the DRAGON…

GEOHIDRA Image: TDI-Brooks
GEOHIDRA Image: TDI-Brooks
GEOHIDRA Image: TDI-Brooks
GEOHIDRA Image: TDI-Brooks

TDI-Brooks reportst that it "effectively and safely" carried out a third-party geotechnical coring project for Geohidra. This operation was conducted from the DRAGON Field to the HIBISCUS platform off the coast of Venezuela and Trinidad aboard the DONA JOSE II (DJII). Throughout this campaign, TDI-Brooks performed a total of eighteen (18) Cone Penetration Tests (CPTs) utilizing their Neptune 3,000 miniature coiled rod CPT system, achieving penetration depths between 3.25 and 6.25 meters in water depths of 130 to 150 meters. Additionally, eighteen (18) Box Core samples and eighteen Cyclic Mini T-Bar tests on Box Core samples were completed.

Content Original Link:

Read full article from Original Source OFFSHORE ENGINEER

" target="_blank">

Read full article from Original Source OFFSHORE ENGINEER

SILVER ADVERTISERS

BRONZE ADVERTISERS

Infomarine banners

Advertise in Maritime Directory

Publishers

Publishers