01
Thu, May

Space Norway, SubCom Announce Contract-in-Force for Arctic Way Cable System

Offshore Engineer

Space Norway and SubCom announced that a contract is in-force for the survey, design, supply and installation of the Arctic Way Cable System. Providing necessary…

Space Norway and SubCom announced that a contract is in-force for the survey, design, supply and installation of the Arctic Way Cable System. Credit: Space Norway
Space Norway and SubCom announced that a contract is in-force for the survey, design, supply and installation of the Arctic Way Cable System. Credit: Space Norway

Space Norway and SubCom announced that a contract is in-force for the survey, design, supply and installation of the Arctic Way Cable System. Providing necessary route diversity to a region with rapidly increasing data traffic demands, the new system will become a critical asset for transmitting data between the Norwegian mainland, Jan Mayen, and the Svalbard archipelago.

SubCom will produce the components for Arctic Way at its manufacturing campus in Newington, NH, USA. The trunk-and-branch, repeatered system will be approximately 2,350 km in length with direct shore end landings in Bodø, Norway, Jan Mayen, andLongyearbyen, Svalbard. Located entirely within the Arctic Circle (between 67-78°N), the system will be the world’s northernmost subsea cable system and will be installed by one of SubCom’s polar-certified, Reliance Class cable ships.

“Establishing the new Arctic Way cable system is imperative to ensure that

Content Original Link:

Read full article from Original Source OFFSHORE ENGINEER

" target="_blank">

Read full article from Original Source OFFSHORE ENGINEER

SILVER ADVERTISERS

BRONZE ADVERTISERS

Infomarine banners

Advertise in Maritime Directory

Publishers

Publishers