JDR Cable Systems (JDR), part of the TFKable Group, has completed two new type test qualifications at 132kV for static and dynamic array cables, supporting the next…
JDR Cable Systems (JDR), part of the TFKable Group, has completed two new type test qualifications at 132kV for static and dynamic array cables, supporting the next generation of fixed and floating offshore wind projects.
The successful testing marks a critical step in delivering U.K.-manufactured high-voltage cables, ready to support larger turbines and deliver power over longer distances, enabling more efficient and cost-effective offshore wind energy.
JDR’s static cable development and testing was supported by a Development Grant from the Offshore Wind Growth Partnership, and produced in collaboration with a leading materials supplier, with extensive testing performed at Offshore Renewable Energy (ORE) Catapult.
JDR will manufacture the 132kV cables at its upgraded Hartlepool facility as well as in its new high-voltage cable manufacturing facility in Cambois, near Blyth, Northumberland.
To facilitate the installation of next generation offshore wind turbines at 20 MW and above, as well as accommodating increasing distances from shore and greater water depths, the industry requires significantly higher voltage cables.
By doubling the voltage of the industry-standard 66kV array cable, JDR’s technology will allow increased transmission between turbines at higher-capacity – a vital factor in continuing to reduce the cost of offshore wind and assist in reducing the
Content Original Link:
" target="_blank">