Keel laid for Spanish Navy's second F110-class frigate, first steel cut for third ship
Spanish shipbuilder Navantia has laid the keel of the future Roger de Lauria, the second F110-class frigate ordered by the Spanish Navy, at its facilities in Ferrol.
On the same day, Navantia cut the first steel to be used in the construction of the future Menéndez de Avilés, the third ship in the class.
Content Original Link:
" target="_blank">