VARD signed a contract with Taiwan's Dong Fang Offshore for the design and construction of one Offshore Subsea Construction Vessel, with option(s). The vessel is of VARD 3 39 design, and the
VARD signed a contract with Taiwan's Dong Fang Offshore for the design and construction of one Offshore Subsea Construction Vessel, with option(s). The vessel is of VARD 3 39 design, and the value of the contract is $125m.
This is the third vessel VARD is building for DFO, with the first two being Commissioning Service Operations Vessels, contracted in May 2024.
DFO aspires to be the supplier of choice to deliver international standard cable installation and repair solutions in the wind and telecoms industries, operations and maintenance solutions for offshore wind farms, and the delivery of turnkey marine construction solutions in Asia Pacific.
The vessel contracted is a versatile platform designed and equipped for subsea operation duties, offshore wind operations & maintenance activities, as well as cable installation and repair scopes in the offshore wind and telecoms sectors. With its optimized hull form together with a powerful propulsion configuration, the vessel will have particularly good sea-keeping capabilities, including reduced motions and accelerations and excellent station keeping performance. The design has focused on the environmental footprint with an efficient machinery and propulsion set-up for high station keeping capabilities including battery hybrid propulsion, delivering improved workability and operational reliability.
The
Content Original Link:
" target="_blank">