09
Mon, Jun

Norwegian Shipping Firm Expands Berg Propulsion Package Order

Norwegian Shipping Firm Expands Berg Propulsion Package Order

MARINELOG

Skarv Shipping Solutions, a joint venture between Peak Group and Grieg Edge, has increased its order for ‘zero carbon project carriers’ from Shandong Huanghai Shipbuilding to five ships, extending its commitment to

Skarv Shipping Solutions, a joint venture between Peak Group and Grieg Edge, has increased its order for ‘zero carbon project carriers’ from Shandong Huanghai Shipbuilding to five ships, extending its commitment to a Berg Propulsion package that optimizes vessel efficiency regardless of power source.

Skarv specified inline ammonia-ready engines for the initial four 7,000 dwt ships, with the first ship due delivery in the fourth quarter of 2025, followed by three more through 2026. The fifth vessel – due delivery in the second half of 2027 - will feature DF ammonia/MGO capability.

In all cases, vessel performance will count on integrated control and propulsion technology from Berg which is designed to work with a full range of alternative marine fuels and other green energy sources.

Berg collaborated closely with Skarv and ship designer LMG Marin to devise a tailor-made, adaptable propulsion solution for the 108-meter-long vessels.

Each ship will feature a single screw controllable pitch installation from Berg with a large propeller diameter and high system torque capability, optimized to match hull/power/speed - and in this case ice class - as well as thrusters.

Berg’s control, power distribution and energy management system integrates main engine, battery and shore power sources

Content Original Link:

Read Full article form Original Source MARINELINK

" target="_blank">

Read Full article form Original Source MARINELINK

SILVER ADVERTISERS

BRONZE ADVERTISERS

Infomarine banners

Advertise in Maritime Directory

Publishers

Publishers