Cost hike prompts alternative concept search for second UK-Belgium interconnector
Given the recent increases in the cost of high-voltage direct current (HVDC) infrastructure, a new approach will be devised to construct the next phase of an energy island envisioned to be built some 45 kilometers off the Belgian coast, including the development of a second interconnector between Belgium and the UK.
The post Cost hike prompts alternative concept search for second UK-Belgium interconnector appeared first on Offshore Energy.
Content Original Link:
" target="_blank">