12
Sat, Jul

WATCH: Aker BP slotting puzzle pieces in place to ensure North Sea oil project’s 40-year lifespan

WATCH: Aker BP slotting puzzle pieces in place to ensure North Sea oil project’s 40-year lifespan

Green Energy
WATCH: Aker BP slotting puzzle pieces in place to ensure North Sea oil project’s 40-year lifespan

Aker BP is piecing together the remaining sections of the utility model puzzle designed for a production and wellhead platform (PWP) that will help ensure hydrocarbon production at its field in the southern part of the Norwegian sector in the North Sea for 40 more years.

The post WATCH: Aker BP slotting puzzle pieces in place to ensure North Sea oil project’s 40-year lifespan appeared first on Offshore Energy.

Content Original Link:

Original Source OFSHORE ENERGY

" target="_blank">

Original Source OFSHORE ENERGY

SILVER ADVERTISERS

BRONZE ADVERTISERS

Infomarine banners

Advertise in Maritime Directory

Publishers

Publishers